Hetherington Heating and Plumbing Ltd
Contact: Alan Hetherington
Tel: 01235 851056
email: hhp.T21@btinternet.com
Services: Plumbing and Heating. Gas and Oil.
Qualifications and Approvals: CORGI OFTEC
South Oxfordshire
Contact: Alan Hetherington
Tel: 01235 851056
email: hhp.T21@btinternet.com
Services: Plumbing and Heating. Gas and Oil.
Qualifications and Approvals: CORGI OFTEC
Contact: Stuart Norman
Tel: 01235 850745
email: Stuart_Norman@btinternet.com
Services:
Qualifications and Approvals: A.C.M.A.
Contact: David Warren
Tel: 01235 850549
Services: Roofing services
Qualifications and approvals: Est. 1997
A series of lower speed limits are to be introduced on Oxfordshire roads in a bid to cut down on the number of accidents.
Oxfordshire County Council has approved the new 50mph limits following research showing that similar speed limit reductions have delivered a 30 per cent reduction in accidents. Along with two other roads in the county, a new 50 mph speed limit will be introduced on the B4017 from Abingdon to Drayton.
In addition, a new 40 mph speed limit will be introduced on the A417 between East and West Hendred on a trial basis.
During November and December, Oxfordshire County Council will be carrying out a review of the bus service (Abingdon Bus Company No. 94) which operates through Upton.
Childcare OFSTED Registered Childminder has part time places (maximum of 3 children are cared for at any one time) with local school and nursery collections.
A project aimed at maintaining the life of the 200 year old listed bridge that carries the Shillingford to Wallingford road across the River Thames will be starting soon.
Oxfordshire County Council will embark on the Shillingford Bridge project on March 5. In this first stage of work a set of traffic lights will be installed which will allow the traffic lane across the bridge to be reduced to just one central lane, initially marked by white lining.The project will last for around five weeks and for most of this period the bridge will remain open to traffic with temporary traffic signals in operation.
However for around five days from March 26 a full closure of the bridge will be required. A signed diversion route via the A4074, A4130 and Winterbrook Bridge will be put into operation.
The Council will revisit the bridge in the Autumn to conduct waterproofing work and to construct footways across the bridge on each side of the road. In 2008 a third stage of work is also planned, involving extensive stone work repairs to various areas of the bridge.
The Highways Agency are undertaking essential road maintenance works on the A34, between the West Ilsley Interchange and the A417 over bridge near Harwell. The preliminary works for the scheme began on 10th January 2007.
The preliminary works for the A34 Chilton maintenance scheme began on 10th January 2007.
From 15th January 2007, there will only be one lane open in each direction through the extent of the works.
From this date, the northbound West Ilsley on slip and northbound Chilton off slip will also be closed for four weeks, weather permitting.
Details as to when the contra flow will be installed to follow. For full details, and for information and maps regarding diversions, please see the project Home Page.
The Highways Agency will be undertaking essential road maintenance works on the A34, between the West Ilsley Interchange and the A417 overbridge near Harwell. The works are due to start in January 2007 and are programmed to finish in March 2007, weather permitting.